Office Relocation
AT-NET plans and runs the technology side of an office move, from internet circuits and phone porting to network setup and equipment moves. The goal is staff working normally on their first day in the new space.
Why choose AT-NET for Office Relocation?
Downtime during a move stalls the whole office. AT-NET schedules the cutover for evenings or weekends and restores critical systems first.
Equipment in transit puts data at risk. AT-NET verifies backups and checks encryption before anything leaves the old office.
Carriers and cabling contractors each need scheduling. AT-NET coordinates circuits, number porting and cabling work with them.
Staff lose time on small post-move glitches. AT-NET follows up on printer mapping, Wi-Fi gaps and phone settings.
Phones that stop ringing on move day cost business. AT-NET ports your numbers and updates E911 dispatchable locations for the new address.
What Our Clients Say About AT-NET
“As the general manager of a small, but complicated company, I couldn’t recommend AT-NET enough. When we need them it is usually something we need handled quickly and after years of service they have always been there. They also keep us up to date on the latest options and simply guide us to the decision we feel is best for our company. There is no pressure to purchase anything, they simply explain what is available and why we may or may not need it. Five stars, 100%.”
“AT-NET really knows how to cater to their customers. Their Security Services and IT/wiring consulting has really helped us increase productivity, and focus on our business. Great customer service. Will and Chris are the best.”
How AT-NET Handles an Office Move
Internet circuits and number porting depend on carriers, so planning starts well before move day. AT-NET coordinates with carriers and cabling contractors, schedules each step and agrees the scope with you in a project plan. You know what happens when, and who is responsible.
Before servers and storage are powered down, AT-NET verifies full backups, including an off-site or immutable copy. Laptops and drives are checked for encryption such as BitLocker. Every piece of equipment is tracked on an inventory, so you can account for it between offices.
AT-NET installs and tests internet, firewalls, switches and Wi-Fi at the new site before equipment arrives. Internet can be set up with failover. Desktops, printers and conference rooms are reconnected and checked, so problems surface during the move rather than on Monday morning.
A move is a natural time to retire old hardware. AT-NET securely wipes or destroys drives that are being retired instead of moved. That keeps old patient, client or financial data from leaving your control during the transition.
Some issues only appear once staff are back at work, such as printer mapping, Wi-Fi coverage gaps or phone settings. AT-NET provides follow-up support for these. Engineers can be on-site the first business day when your plan includes it. After that, a person answers our 24/7/365 support line in under 60 seconds on average.
The cutover is scheduled for evenings or weekends. Servers and critical systems come back online first. Before the move, AT-NET confirms cloud services and phones work from anywhere. Remote access lets staff keep working while equipment is in transit.
AT-NET by the Numbers
The Technology Side of Your Move
An office move goes wrong when the internet is not live or the phones do not ring on day one. AT-NET plans the technology work well in advance. We coordinate circuits, number porting and cabling with carriers and contractors, and test the new space before move day. Equipment is packed, moved and reconnected in a planned order, and the cutover happens outside business hours.
What a Typical Move Includes
- Firewalls, switches and Wi-Fi access points installed and tested before move day.
- New internet service set up with failover, so a single circuit outage does not stop work.
- Phone numbers ported for Microsoft Teams Phone or VoIP, with E911 dispatchable locations updated.
- Servers, printers, desktops and conference rooms moved and reconnected in a planned order.
- Verified backups, including an off-site or immutable copy, before servers are powered down.
Who This Is For
This service fits businesses moving to a new office. AT-NET handles the technology side of the move. If the new space needs new cable runs, see Certified Structured Cabling Installation for how that work is designed and tested. The exact scope of each move is agreed in your project plan.
Share your move date and new address, and we will map out the technology work and timeline.
Office Relocation Questions Answered
AT-NET minimizes disruption by planning the technology side of your move well in advance and doing the cutover outside business hours. We coordinate internet circuits, phone number porting and cabling with carriers and contractors, test the new space before move day, and pack, move and reconnect equipment in a planned order, with the goal of having staff productive on their first day in the new office.
An office move typically covers cabling, network equipment, phones, workstations and internet service. AT-NET can plan structured cabling, install firewalls, switches and Wi-Fi access points, set up internet with failover, move servers and printers, reconnect desktops and conference rooms, and port numbers for Microsoft Teams Phone or VoIP, including updating E911 dispatchable locations. The exact scope is agreed in your project plan.
Sensitive data is protected by backing it up before anything moves and keeping devices encrypted and tracked in transit. AT-NET verifies full backups, including an off-site or immutable copy, before servers and storage are powered down, confirms laptops and drives use encryption such as BitLocker, maintains an equipment inventory, and securely wipes or destroys any drives being retired instead of moved.
Downtime is minimized by scheduling the cutover for evenings or weekends and having the new site ready before equipment arrives. AT-NET installs and tests internet, network and Wi-Fi in advance, confirms cloud services and phones work from anywhere during the transition, and brings servers and critical systems back online first. Remote access lets staff keep working while the physical move happens.
After the move, AT-NET provides follow-up support for issues that show up once staff are back at work, such as printer mapping, Wi-Fi coverage gaps or phone settings. Engineers can be on-site for the first business day when that is included in your project plan, and ongoing help is available 24/7/365 through our support line, where a person answers in under 60 seconds on average.